Remaining: From the VAB, the crawler transporter positions by itself beneath Mobile Launcher 1 in preparation for rollout of SA-501 to the launch pad – Notice the worker in the foreground for sizing comparison.The new style and design Middle features style, verification, and validation engineering groups that may deal with the longer term structu